Ultimate Cell
  • About Us
    • About Us
    • Customers
    • Testimonials
  • Technology
    • Technology
    • Car Device
    • Boat Device
    • Trucks and Power Generators Devices
    • Machinery and Industrial Transportation Device
    • Continuous Combustion Optimization
    • Hydrogen production units
  • Where to Install
  • Certification
  • Media
    • News
    • Videos
  • Simulator
  • Contacts
  • en
    • pt-pt Português

26/03/2015

ZER – Circulation permission after the installation of an exhaust emissions reduction device – ULTIMATE CELL®

The circulation of Euro1 and Euro2 classified vehicles is allowed in the designated areas of the Lisbon Low Emissions Zone, as long as they have retrofitted an exhaust emissions...

More Info

02/03/2015

Article in Newspaper Expresso about ULTIMATE CELL

ENGLISH VERSION – WEEKLY NEWSPAPER EXPRESSO – 28th February 2015

More Info

Search

Recent News

  • Conference “Materials and the Hydrogen Row” Ultimate Power’s experience in H2 production
  • Ultimate Power was present at Gastech 2021
  • High Level Conference on Hydrogen “Hydrogen in Society – Bridging the Gaps”
  • Conference “Hydrogen in Society – Bringing the Gaps.”
  • Ultimate Power CEO says the Hydrogen is essential for “Decarbonize”
  • Hydrogen Now !
  • Hydrogen production for the world. AICEP highlights us in Case Studies in Portugal
  • Ultimate Power® exported its first UCHP60 – Ultimate Cell Hydrogen Production 60

News Archive

  • 2021 (7)
    • November(1)
    • September(1)
    • April(2)
    • February(1)
    • January(2)
  • 2020 (14)
    • December(1)
    • October(3)
    • September(2)
    • July(1)
    • June(2)
    • April(2)
    • March(1)
    • January(2)
  • 2019 (4)
    • November(2)
    • October(1)
    • July(1)
  • 2018 (2)
    • December(1)
    • January(1)
  • 2017 (6)
    • December(1)
    • October(1)
    • September(3)
    • March(1)
  • 2016 (7)
    • December(1)
    • October(1)
    • May(1)
    • March(2)
    • February(2)
  • 2015 (8)
    • November(1)
    • October(1)
    • August(1)
    • June(1)
    • March(2)
    • February(1)
    • January(1)
  • 2014 (11)
    • December(1)
    • November(3)
    • October(1)
    • September(2)
    • August(3)
    • July(1)

Useful Information

  • Frequently Asked Questions
  • Where to Install
  • Resellers
  • Become a Certified Installer

  • Eco-driving

Contacts

T. +351 211 376 838
geral@ultimatepower.pt


Projetos Portugal 2020:

  • Especialização na Qualidade e Certificação de produtos
  • PROGRAMA ADAPTAR - Adequação da actividade e organização às normas legais «Anti Covid»
  • EMPREGO Urbano (Gal) FatorC

© 2022 Ultimate Cell | Powered by Websystems

In case of dispute the consumer may resort to the Lisbon Alternative Dispute Resolution Entity at www.centroarbitragemlisboa.pt.
More information at www.consumidor.pt